Intrepid's Plan
Following the successful completion of a large dipole induced polarization ("IP") ground-based geophysical survey at the Tombstone South Property, Intrepid is planning a 4,000-metre (4 – 5 holes) drill program. The objective of the drill program is to intersect previous mineralization identified higher in the Bisbee Sediments and test deeper target areas.


